|
Pacheco Pass Landfill - Closure and Landfill Gas System Design
Client:
NORCAL Waste Systems, Inc.
San Francisco, California
Project Description:
EBA provided design, permitting and construction inspection services for the installation of a landfill gas extraction, collection and destruction system for both the inactive landfill and active portions. The system consists of vertical wells, above ground collection piping, blowers and a flare station. EBA collected field samples of the landfill gas, evaluated generation rates and sampled condensate for determination of the preferred available disposal options.
EBA Provided the Following Services:
- Prepared the design and construction plans, specifications and bid documents for equipment procurement and system installation.
- Involved in contractor bid review and selection.
- Prepared permitting documentation and coordinated Authority to Construct and Permit to Operate from the Bay Area Air Quality Control Board and County Building Department.
- Performed periodic site inspection during landfill gas extraction system construction.
- EBA also prepared Preliminary Closure and Postclosure Maintenance Plans which included the design of a geosynthetic cap over lined portions of the landfill. In addition, EBA prepared the site's Stormwater Pollution Provention Plan.
|